Sunday, January 22, 2012

Lots of Stuff


1) My quilt topper is done, now it is time for selecting the fabric for the backing.
Here is the last blog, http://c-hampe.blogspot.com/2012/01/strip-quilt-topper-done.html.

Troy isn't a huge fan of the colors in this topper. But he was a trooper and went with me to select fabric. I lead him down the batik isle. This is what we have found.

Blue Batik Fabrics

Testing the topper with backing


YEAH--- I think we will have to find something different

2) My Unemployment Journey
I think I have told you, I have found myself unemployed for the 2nd time in less than 12 months. Last year while unemployed, I sat at the house all day mad at myself and others and lead myself down a depressed road. I wouldn't go anywhere for days, not getting out of my pj's for days. That was sooo not productive!


This year with the unemployment experience, I have found myself working part time at a great jewelery company, I am making myself get up, dressed, make up and heels on almost every day. I have become proactive in the job search. I have met new people that are helping me and I am helping them. I know that I am not in this pit of unemployment alone any longer. The way that I have tackled this is more like how you would expect me to tackle any project- running head on into the project, with a smile on my face, and with the end goal of a future customer or employer in my sights.

Look out that HUGE confidence that I thought I lost, Its B-A-C-K!!!

I hope that tomorrow I have time to sit down and do a link love post to all the sites that have helped in my search.

3) Cooking New things
crockpot barbecue chicken ---- this was THE BEST recipe we have found in a long time. Friends were fighting over how many chicken pieces do they get. I wish I had a picture, but the food was gone before I thought about the camera.

comfort food night--- Troy and I have wanted hot dogs, this isn't something either of eat buy maybe once a year.... He loaded his dog up with mustard, chili and cheese. I loaded my up with homemade mac n cheese. His didn't look good, so no photos... but check out the best dog dinner.

Scallop Piccata with Sautéed Spinach--- this is coming soon soon!

4) We hosted Dinner In with Friends
That's where we feasted on the Crock Pot Chicken. We played L-R-C for nickles and then busted the Go Fish Card game out (had all the Golden Book characters). I hate to admit, we are all mid to late 30s, with no kids around.... GO FISH???


Girls
Couple #1

Couple #2

Couple # 3



L R C in actions
L R C Pot
30- somethings playing Go Fish
Really?? Go Fish??

















E*Trade Baby Commercial

Troy and I have hit the rewind button three times during the 49er v Giants game tonight. This commercial is the best thing I have seen on TV all night!


Great job E*Trade marketing dept!

Tuesday, January 10, 2012

Strip Quilt- Topper Done!

I can not believe that I completed a quilt top and it LOOKS good! The tutorials and guilds that showed this online was giving a time frame of 30-50 minutes. WELL, not for me that's for sure.

Here is the break down on time for this newbie-
Wash, dry and iron strips- 55 minutes
Sewing 48 strips end to end- 45 minutes
Cutting on the crap scraps off the cheap fabric- 30 minutes (THIS WAS THE WORSE!)
Matching end to end and right side to side side on the first length- 2 hours
Matching end to end and right side to side side on the second length- 1.75 hours
Matching end to end and right side to side side on the third length- 1.5 hours
Matching end to end and right side to side side on the fourth length- 45 minutes
Matching end to end and right side to side side on the fifth length- 25 minutes
Total time (the best leisure time to myself in a long time)- almost 7 hours

The "recipe" for this quilt top calls for 40 strips of 2.5"x42". I of course used 48 strips (over achiever). The topper has finished (before ironing) at 50"x68". I am now thinking what the border/binding and backing will be.


Layed out on a queen bed

Horizontal?

Vertical?

Hanging in the hall

Strip Quilt- 2nd Day Sneak Peak

Its coming together!!! Here are some rough pictures...




Cant wait for it to be complete and snuggle in!!

Sunday, January 8, 2012

Take 2-- New Quilt

I showed you back in November what my first quilt looked like and what my inspiration was for a 2nd quilt (check out that post here).


I purchased a cheap "jelly roll" for this quilt. I washed my strips and thought I had ruined it all before it started; the cheap fabric FRAYED big time. But hey, I am a newbie and I am going for it! (Here is one of the blogs I am using to help me along in the process, thank you Kate!)


I have the "Step One" done and tomorrow hope to sit down and complete the topper. Check out these first few photos.


Jelly Rolls-- so sweet and innocent looking


Washed, dried, ironed and waiting


Crazy colors


Everybody in the bucket for random draw


Strung down the hall


Looks like a party!

As a beginner, I couldnt just do what the directions state--- 2304 inches of fabric

Stay tuned... hope to have a finished topper soon soon!